Constantine tramway


 Constantine tramway


Location:
        Constantine

Country:
        Algeria

System:
        Constantine tramway

Year Opened:2013

Type: Tram


The Constantine Tramway is a tramway system which has been operating in Constantine, Algeria, since 2013.

There have been several delays and cost over-runs in the construction of the tramway. Originally scheduled to enter revenue service in November 2011, the first section of 8.9 kilometres with 10 stations between the Ben-Abdelmalek-Ramdhan stadium and Zouaghi opened on 4 July 2013 and includes 5 additional stations as of 2019.

6 more stations opened on 29 September 2021.

Overview

Status:
        Completed

Owner:
        Algiers Metro Company

Locale:
        Constantine, Algeria

Termini:
        Chahid Kadri Brahim
        Constantine University 2

Stations: 21 (initial phase)

Type: Tramway

Services: 1 (initial phase)

Operator(s): Algiers Metro Company

Depot(s): Ali Mendjeli depot

Rolling stock: 27 Alstom Citadis 302

Opened: 4 July 2013

Line length: 18.2 kilometres (11.3 mi) approx. (initial phase)

Track gauge: 1,435 mm (4 ft 8+1⁄2 in) standard gauge

Electrification: 750 V DC OHLE

750 V DC OHLE: 70 kilometres per hour (43 mph) (off-street).